Restaurant Remodelingin Northern California
A restaurant remodel has a rule the calendar enforces: every day closed is revenue gone. We plan remodels in phases — dining room while the kitchen runs, kitchen during a short dark period, patio in parallel — to keep you serving as much of the time as possible.
Licensed & Insured · CSLB #1130548 · 5.0★ on Google, Yelp, Thumbtack & Angi

The Work
Done Right, Documented, and Inspected
Whether it's a refresh before a lease renewal or a full concept change, we handle the construction, the equipment swap, and the re-inspections that come with touching a commercial kitchen.
Every project runs under Sarmento Bros. Construction Inc. — CSLB #1130548, fully insured with general liability and workers' compensation. Based in Manteca, we serve businesses and property owners across the Central Valley, East Bay, and greater Northern California.
What We Handle
- ✓ Dining room and bar renovations
- ✓ Kitchen reconfiguration and equipment swaps
- ✓ Flooring, tile, and wall finishes built for wear
- ✓ Lighting and ambiance upgrades
- ✓ ADA upgrades triggered by remodel permits
- ✓ Phased scheduling around your service hours
Service Spotlight
A Closer Look at This Service

How It Works
A Straightforward Process
01
Walk & Scope
We meet at your space, listen to what you need, and scope the job honestly — including the parts other bids leave out.
02
Fixed Estimate
A written, itemized estimate with a real schedule. Free, and good numbers — not a teaser that grows later.
03
Permits & Build
We handle drawings, permits, and inspections, then build with our own crews and trusted trade partners.
04
Walkthrough & Closeout
Final walkthrough together, punch list closed, documents handed over. Done means done.
Common Questions
Restaurant Remodeling FAQs
Can we stay open during the remodel?+
Usually, at least partially. We phase work and schedule the disruptive trades overnight or on your closed days. Where a dark period is unavoidable, we compress it and tell you the exact dates up front.
Will a remodel trigger ADA or code upgrades?+
It can — restrooms and path of travel are the usual ones. We identify what your permit will trigger before you commit, so the budget reflects the whole job.
How fast can a dining room refresh happen?+
Paint, lighting, flooring, and fixtures can often be done in 2–3 weeks of night work without closing at all.