Call 209-637-7379
Sarmento Bros. Construction Inc. logo — Commercial Construction, Tenant Improvements, ADU, Design-Build

Commercial Concretein Northern California

Concrete is unforgiving — it's cheap to do right once and expensive to do twice. We pour and finish commercial concrete across Northern California: slabs, footings, sidewalks, ADA ramps, and the saw-cut-and-replace repairs that keep a property safe and compliant.

Licensed & Insured · CSLB #1130548 · 5.0★ on Google, Yelp, Thumbtack & Angi

Commercial Concrete by Sarmento Bros. Construction Inc. in Northern California

The Work

Done Right, Documented, and Inspected

Layout, subgrade, reinforcement, finish, cure. Every step checked, because there is no patching your way out of a bad pour.

Every project runs under Sarmento Bros. Construction Inc.CSLB #1130548, fully insured with general liability and workers' compensation. Based in Manteca, we serve businesses and property owners across the Central Valley, East Bay, and greater Northern California.

What We Handle

  • Interior slabs and slab repairs
  • Footings and foundations
  • Sidewalks, curbs, and site flatwork
  • ADA ramps, landings, and truncated domes
  • Saw-cutting, demo, and replacement
  • Equipment pads and bollards

Service Spotlight

A Closer Look at This Service

Commercial Concrete — Sarmento Bros. Construction Inc. service overview

How It Works

A Straightforward Process

01

Walk & Scope

We meet at your space, listen to what you need, and scope the job honestly — including the parts other bids leave out.

02

Fixed Estimate

A written, itemized estimate with a real schedule. Free, and good numbers — not a teaser that grows later.

03

Permits & Build

We handle drawings, permits, and inspections, then build with our own crews and trusted trade partners.

04

Walkthrough & Closeout

Final walkthrough together, punch list closed, documents handed over. Done means done.

Common Questions

Commercial Concrete FAQs

Can you fix trip hazards flagged by our insurance or the city?+

Yes — grinding where it qualifies, saw-cut and replacement where it doesn't, with ADA slopes verified. We document the corrections for your file.

How soon can new concrete take traffic?+

Foot traffic in 24–48 hours, vehicles typically at 7 days, full design strength at 28. We plan pours so the cure time lands on your quiet days.

Do you handle ADA ramp compliance?+

Yes — slopes, landings, handrails, and domes built to current code and measured before the inspector does.